Campbell River system water use plan : revised for acceptance by the Comptroller of Water Rights. --


This version of the GALLOP Portal is in beta testing. 

We are still in the process of uploading all the documents and indexing them to support full-text searching. Some search results might be incomplete at this time.

Please contact cm@ola.org if you have any questions or comments.
 

 

DC Title
Campbell River system water use plan : revised for acceptance by the Comptroller of Water Rights. --
Jurisdiction
British Columbia
Language
DC Date
DC Creator
B.C. Hydro
Campbell River Water Use Planning Consultative Committee (Canada)
B.C. Hydro.Generation Resource Management
British Columbia.Comptroller of Water Rights
British Columbia.Ministry of Forests, Lands and Natural Resource Operations
DC Publisher
[Vancouver, B.C.] : B.C. Hydro, Generation Resource Management,
ID
pubdocs_bcdocs2013_525966_campbell_river_wup_accept_2012_11_21
DC Type
text
Bibtype
m
DC Description
Cover title.
Signed by Renata Kurschner, Director, Generation Resource Management. Cf. Added t.p.
"The conditions in this Water Use Plan ... reflect the March 2004 consensus recommendations of the Campbell River Water Use Planning Consultative Committee report, the draft Water Use Plan and Water Use Plan Order referred in August 2007, and subsequent recommendations from the Comptroller of Water Rights."--P. 1.
"Nov. 21, 2012. v6."
Catalogue record made available by the British Columbia Legislative Library.
Printed from the Internet.
Stapled in LLBC copy: News release : water use plan benefits fish, wildlife and recreation / Ministry of Forests, Lands and Natural Resource Operations ([2] p. : Nov. 27, 2013)
DC Subject
Water use British Columbia Campbell River
Water use British Columbia Campbell River Region Planning
Water resources development British Columbia Campbell River.
Hydroelectric power plants British Columbia Campbell River Region
Dams British Columbia Campbell River
Strathcona Dam (B.C.).
Ladore Dam (B.C.).
John Hart Dam (B.C.)