Peace Project water use plan : revised for acceptance for the Comptroller of Water Rights. --


This version of the GALLOP Portal is in beta testing. 

We are still in the process of uploading all the documents and indexing them to support full-text searching. Some search results might be incomplete at this time.

Please contact cm@ola.org if you have any questions or comments.
 

 

DC Title
Peace Project water use plan : revised for acceptance for the Comptroller of Water Rights. --
Jurisdiction
British Columbia
Language
DC Date
DC Creator
Kurschner, Renata
B.C. Hydro
Peace Water Use Planning Committee (Canada)
British Columbia.Comptroller of Water Rights
DC Publisher
[Vancouver, B.C.] : B.C. Hydro,
ID
pubdocs_bcdocs_451519_peace_river_water_use_plan
DC Type
text
Bibtype
m
DC Description
Signed by Renata Kurschner, Director, Generation Resource Management. Cf. Added t.p.
"Proposed conditions in this water use plan ... reflect the December 2003 consensus recommendations of the Peace Water Use Planning Committee."--Preface.
"BC hydro [symbol] Generation Resource Managment."--Footers.
"August 21, 2007."
Printed from the Internet.
DC Subject
Water use Peace River (B.C. and Alta.)
Water use British Columbia Peace River (Regional district) Planning
Water resources development Peace River (B.C. and Alta.)
Hydroelectric power plants British Columbia Peace River (Regional district)
Dams Environmental aspects Peace River (B.C. and Alta.)
W.A.C. Bennett Dam (B.C.)
G.M. Shrum Generating Station (B.C.)
Peace Canyon Dam (B.C.)
Peace Canyon Generating Station (B.C.)