DC Title
Peace River Site C hydroelectric development pre-construction fisheries studies : fish movements and population status : 1990 studies : interim final report / submitted to B.C. Hydro, Environmental Resources Division ; prepared by R. Pattenden, C. McLeod, G. Ash ; in association with K. English. --
Jurisdiction
British Columbia
Language
DC Date
DC Creator
Pattenden, R.
McLeod, C.
Ash, G.
English, K.
B.C. Hydro.Environmental Resources
R L & L Environmental Services
LGL Limited environmental research associates
DC Publisher
[Vancouver, B.C. : B.C. Hydro],
ID
pubdocs_bcdocs_450547_site_c_peace_river24
DC Type
text
Bibtype
m
DC Description
Running title: Peace River Site C : fish movements and population status : interim final report.
Issued by R.L. & L. Environmental Services Ltd. and LGL Ltd.
"July 1991."
Includes bibliographical references.
Posted on the Internet in 2008.
Printed from the Internet.
DC Subject
Peace River Site C Project
Fishes Conservation Peace River Region (B.C. and Alta.)
Dams Environmental aspects Peace River (B.C. and Alta.)
Hydroelectric power plants Environmental aspects Peace River (B.C. and Alta.)