Puntledge River Project water use plan : revised for acceptance by the Comptroller of Water Rights. --


This version of the GALLOP Portal is in beta testing. 

We are still in the process of uploading all the documents and indexing them to support full-text searching. Some search results might be incomplete at this time.

Please contact cm@ola.org if you have any questions or comments.
 

 

DC Title
Puntledge River Project water use plan : revised for acceptance by the Comptroller of Water Rights. --
Jurisdiction
British Columbia
Language
DC Date
DC Creator
B.C. Hydro
Weiss, Eric
British Columbia.Comptroller of Water Rights
Puntledge River Water Use Plan Consultative Committee (Canada)
DC Publisher
[Vancouver, B.C.] : B.C. Hydro,
ID
pubdocs_bcdocs_404112_environment30828
DC Type
text
Bibtype
m
DC Description
Running title: Puntledge River Project water use plan.
Signed by Eric Weiss, Manager, Plant Operations. Cf. Added t.p.
"Changes proposed ... reflect the recommendations of the Puntledge River Water Use Plan Consultative Committee."--Preface.
"BC hydro [symbol] Generation."--Footers.
Available on the Internet.
"1 December 2004."
Printed from the Internet.
DC Subject
Water use British Columbia Puntledge River.
Water use British Columbia Vancouver Island Planning.
Water resources development British Columbia Puntledge River.
Hydroelectric power plants British Columbia Vancouver Island.
Dams Environmental aspects British Columbia Puntledge River.